Item #612175 Critical Path Analysis and The Civil Engineering Industry. An uncommon original article from the Institution of Civil Engineers reports, 1968. D. H. Wade.

Critical Path Analysis and The Civil Engineering Industry. An uncommon original article from the Institution of Civil Engineers reports, 1968.

London: Institution of Civil Engineers, 1968. Booklet - Unbound Pages. Very Good. Item #612175

29 pages. An authentic standalone article, extracted from a larger volume. Not a reprint or reproduction, but an original work in its own right. Supplied without title page or cover. Size: 14 x 22 cms. Category: Institution of Civil Engineers;.

Keywords: BZDB395 Institution of Civil Engineers; D. H. Wade Critical Path Analysis and The Civil Engineering Industry. An uncommon original article from the Institution of Civil Engineers reports, 1968.

Price: £9.95

See all items by